In first image Beaking in PV loop is suggestive of pressure over load. Optimising PEEP to 7-8 cmH20 and PC above PEEP for the VT of 7-8 ml/kg. Yes. Second images was suggestive of high PEEP and generation of auto PEEP. Reducing PEEP to optimal will be helpful.